Application methods fireproof doors, wooden doors


Working time: 8h am - 12h - 13h-17h pm
The leader works directly responsible for the organization of construction works in a way that ensure the technical requirements, safety ... during the construction and installation of doors

- Process and installation of wood fire doors door type:

Step 1: Check the installation location of the door

Contact investors, builders or contractors responsible for supplies storage layout

Step 2: Get in building materials and layout of materials, equipment and machinery

Contact investor, general contractor, project manager of the power supply and the safety conditions before construction

Step 3: Installation

- The head of contact receiving space does not reach the cell wall will require the contractor to revise

- Moving to the door and the place of installation equipment

- Installation frame

- Installation of doors and accessories

- Check and cleaning

- Acceptance of internal

Step 4: Clean the entire work

Step 5: offers investors, design consultants, consultants to supervise handover acceptance

Transferred to track parts warranty.

 

Products features

  • AUTOMATIC DOOR RAY KYK NEW DC90
  • STEEL FIRE DOOR HISUNG : 900X2200MM
  • AUTOMATIC DOOR RAY HODOLON HO460
  • ' AUTOMATIC DOOR RAY KYK BLDC 350
  • AUTOMATIC DOOR RAY MYONE BENINCA

Statistical access

  • Online: 154
  • Total access: 17433
(+84) 908 117 848
(+84) 908 117 848
(+84) 938 905 505
(+84) 938 905 505