METHODS OF ORGANIZATION OF CONSTRUCTION (Chapter II_2.2,3,4,5,6,7,8)


2.2. ORGANIZATION MODEL ORGANIZATION OF CONSTRUCTION WORKS

  • Organized according to the construction commanding model. General manager in charge.
  • At the construction site, there is the Chief Commander and the professional technical staff. The project steering committee is entitled to manage and arrange the workers directly, perform the planned tasks.
  • The chief commander directly administers and performs the functions and powers within the scope of the authority assigned, in coordination with the professional departments of the company to accomplish the common goal.

 

2.3. MANAGEMENT AT HEAD OFFICE OF THE COMPANY

The General Director of the company directs, inspects and controls the execution of works and related economic contracts, regulates the construction among the parts of the company when necessary.

  • To ensure good performance of production and business tasks, the company management focused on construction resources, equipment improvement.
  • The functional departments of the company are responsible for checking the entire construction process, assisting the General Director in coordinating all production activities on equipment, supplies, capital ... for the Operation Steering Committee.
  • Valuing information, reporting and close coordination from the parties

 

2.4. INSPECTION MANAGEMENT

* RESPONSIBILITIES OF THE DIRECTOR :

  • Ensuring work schedule, quality, labor safety and environmental sanitation.
  • Resolving investor's requirements during the construction process.
  • Properly use the staff to help promote the maximum professional ability and enthusiasm in the work of workers.
  • Organize the scientific construction site from the entrance, outfits and eating in order, hygiene and public school.
  • Work directly with the project management board to resolve all pre-construction procedures such as: Economic contracts, water and electricity construction, communications, ensuring security and order at the construction site not to lose cool equipment, supplies and other obstructing problems such as hoists, electricity grids ... and affect the progress and quality.
  • Decide on all solutions due to the actual construction arising in the organization and operation.
  • Adjust the job content in the work item and the time to start the construction construction items to suit the reality on the basis of ensuring the overall construction progress.
  • Coordinate well the construction teams so that the work progresses well without overlap. Ensure safety during construction.

 

2.5 QUALITY MANAGEMENT DEPARTMENT

   This department performs the quality control, inspection of input materials at each construction phase of the items in accordance with the technical requirements. When detecting quality violations at the scene, they may propose to the Commander to take measures to handle and promptly adjust them.

 

2.6. TECHNICAL MANAGEMENT DEPARTMENT OF CONSTRUCTION AND LABOR SAFETY

  • The commander-in-chief and the technical staff will study the design drawings, formulate constrction methods and labor safety and hygiene measures.

  • On the basis of the approved overall schedule, set specific construction schedules for each month,week and day, including the preparation of supplies, human resources, machinery and equipment, and factory-released products. and the requirements for craftsmen, hand tools, testing equipment, especially for supplies must ensure the quality requirements in accordance with design standards and quality assurance assessment, progress of the work. submit.

  • This department regularly checks the construction process in the field. Check for door-to-wall cnnections ...

  • Managing construction documents and accepting works. Each stage according to the schedue must be checked and accepted for acceptance.

  • Always check and supervise to ensure labor safety in all construction processes.

 

2.7. DIRECT CONSTRUCTION FORCES

  • Installation team: Including 8 people installing products in accordance with the process, quality assurance and labor safety.
  • Completion team: Including 8 people. Construction of works such as gluing, cleaning glass, stamping, marking on products, collecting waste and excess materials in the construction area, ensuring clean products before handover and safety. labor.

 

2.8. PREPARING FOR CONDITIONS OF CONSTRUCTION AND CONSTRUCTION SITE:

2.8.1. GENERAL REQUIREMENTS

  • The construction unit has major measures to enhance the management of construction quality and labor safety in construction and environmental sanitation:
  • Thoroughly understand and implement to each technical ministry, installation teams, complete the content of documents of the Government, the Ministry of Construction and the Company on the quality management of construction works and security. safety in construction, fire prevention and environmental sanitation.
  •  In addition to the construction methods, measures to ensure safety in construction and environmental sanitation, the construction progress, the construction units must closely coordinate with the PMU on the implementation of construction measures, working time, specific schedule.
  • The construction unit must disseminate the work quality management (depending on the construction work) to the technical staff and workers before starting the construction of the work item.
  • The construction unit carries out the quality management, records the acceptance and signature frame in the receipt of the completed dossier in accordance with Decree 46/2015 / ND-CP dated May 12, 2015 on quality management amount and maintenance of construction works.

 

2.8.2. GENERAL PREPARATION

- Before starting the construction, the preparation must be completed, including measures on organization, construction coordination, and the internal and external site preparation work including:

- Research carefully design documents, construction ground.

- Using a locator, determine the installation location perpendicular. Determine the exact position of the installation of doors according to the position specified on the construction drawing.

 

2.8.3. SURFACE PREPARATION

  • - The construction ground is arranged on the basis of the work's site through actual surveys and construction line requirements, requirements on labor safety and sanitation, environmental sanitation.

 

2.8.4. MATERIALS USED FOR WORKS

  • All materials used for the project will be guaranteed by the GALAXY Contractor with the required quality, in compliance with the technical regulations in the technical design documents or specified by the investor.

 

Products features

  • AUTOMATIC DOOR RAY KYK NEW DC90
  • STEEL FIRE DOOR HISUNG : 900X2200MM
  • AUTOMATIC DOOR RAY HODOLON HO460
  • ' AUTOMATIC DOOR RAY KYK BLDC 350
  • AUTOMATIC DOOR RAY MYONE BENINCA

Statistical access

  • Online: 151
  • Total access: 16921
(+84) 908 117 848
(+84) 908 117 848
(+84) 938 905 505
(+84) 938 905 505